Inquiry

Sizewell C

Graeme represented Northumbrian Water Limited (t/a Essex and Suffolk Water) at the Development Consent Order Examination for the proposed new nuclear power station at Sizewell C in Suffolk, in relation to the Issue Specific Hearings dealing with water supply to the power station during the construction and operational phases. The DCO was granted in June 2022.

Download your shortlist

Download All Download icon